Once the roof has been measured, we remove only the required amount of tiles to install the panels.
Now that the roof has been stripped, we crack on fitting the panel mounting plates.
Time to start adding the panels and connecting them together. Testing each one as we go.
With all the panels now mounted and connected electrically we double check all fixings before the final weather tight flashings are fitted.
Once all panels are fitted, we fit the flashings to ensure the roof retains its water tight seal. Tidy up and head to the plantroom.
Now the roof work is complete. it is time to power up, energise the system and do our commisioning. Enjoy your free electricity.